Level parameters
Durations are shown with a level 1 castle and the 1× world speed used by this guide. Costs and building capacities do not change with world speed.
Level
Points
Effect
1
71
79
101
10
20
0:20:40
Donkey capacity: 1; Carrying capacity: 1000; donkey speed (fields/hour): 5
2
83
92
119
2
40
0:24:20
Donkey capacity: 2; Carrying capacity: 1000; donkey speed (fields/hour): 5
3
96
108
139
2
60
0:28:40
Donkey capacity: 3; Carrying capacity: 1000; donkey speed (fields/hour): 5
4
111
124
162
2
80
0:33:27
Donkey capacity: 4; Carrying capacity: 1000; donkey speed (fields/hour): 5
5
130
145
190
3
100
0:39:13
Donkey capacity: 5; Carrying capacity: 1000; donkey speed (fields/hour): 5
6
150
169
222
3
120
0:45:47
Donkey capacity: 6; Carrying capacity: 1000; donkey speed (fields/hour): 5
7
175
196
261
4
140
0:53:07
Donkey capacity: 7; Carrying capacity: 1000; donkey speed (fields/hour): 5
8
202
228
305
4
160
1:01:53
Donkey capacity: 8; Carrying capacity: 1000; donkey speed (fields/hour): 5
9
234
265
357
5
180
1:11:40
Donkey capacity: 9; Carrying capacity: 1000; donkey speed (fields/hour): 5
10
272
309
418
6
200
1:23:13
Donkey capacity: 10; Carrying capacity: 1000; donkey speed (fields/hour): 5
11
315
360
490
7
220
1:36:13
Donkey capacity: 12; Carrying capacity: 1000; donkey speed (fields/hour): 5
12
365
419
573
8
240
1:51:20
Donkey capacity: 15; Carrying capacity: 1000; donkey speed (fields/hour): 5
13
424
488
672
10
260
2:08:40
Donkey capacity: 18; Carrying capacity: 1000; donkey speed (fields/hour): 5
14
491
568
787
11
280
2:28:33
Donkey capacity: 23; Carrying capacity: 1000; donkey speed (fields/hour): 5
15
568
662
922
13
300
2:51:27
Donkey capacity: 28; Carrying capacity: 1000; donkey speed (fields/hour): 5
16
659
770
1080
15
320
3:17:40
Donkey capacity: 34; Carrying capacity: 1000; donkey speed (fields/hour): 5
17
763
897
1270
18
340
3:47:47
Donkey capacity: 42; Carrying capacity: 1000; donkey speed (fields/hour): 5
18
885
1050
1480
21
360
4:22:27
Donkey capacity: 51; Carrying capacity: 1000; donkey speed (fields/hour): 5
19
1020
1220
1740
25
380
5:02:07
Donkey capacity: 63; Carrying capacity: 1000; donkey speed (fields/hour): 5
20
1190
1420
2030
28
400
5:47:47
Donkey capacity: 77; Carrying capacity: 1000; donkey speed (fields/hour): 5
21
1380
1650
2380
34
420
6:40:13
Donkey capacity: 95; Carrying capacity: 1000; donkey speed (fields/hour): 5
22
1590
1930
2790
39
440
7:40:27
Donkey capacity: 117; Carrying capacity: 1000; donkey speed (fields/hour): 5
23
1850
2250
3270
46
460
8:49:27
Donkey capacity: 143; Carrying capacity: 1000; donkey speed (fields/hour): 5
24
2140
2620
3830
54
480
10:08:47
Donkey capacity: 176; Carrying capacity: 1000; donkey speed (fields/hour): 5
25
2480
3050
4480
63
500
11:39:47
Donkey capacity: 216; Carrying capacity: 1000; donkey speed (fields/hour): 5
26
2870
3560
5250
74
520
13:24:20
Donkey capacity: 265; Carrying capacity: 1000; donkey speed (fields/hour): 5
27
3330
4150
6140
86
540
15:24:20
Donkey capacity: 325; Carrying capacity: 1000; donkey speed (fields/hour): 5
28
3860
4840
7190
100
560
17:42:07
Donkey capacity: 398; Carrying capacity: 1000; donkey speed (fields/hour): 5
29
4470
5650
8410
118
580
20:20:27
Donkey capacity: 489; Carrying capacity: 1000; donkey speed (fields/hour): 5
30
5180
6590
9840
138
600
23:22:13
Donkey capacity: 600; Carrying capacity: 1000; donkey speed (fields/hour): 5